{"id":2527,"date":"2026-11-25T12:15:16","date_gmt":"2026-11-25T12:15:16","guid":{"rendered":"https:\/\/theapnachhattisgarh.com\/?p=2527"},"modified":"2026-11-25T12:15:16","modified_gmt":"2026-11-25T12:15:16","slug":"adani-power-revives-decade-old-stalled-project-commissions-first-660-mw-unit-at-korba-in-chhattisgarh","status":"publish","type":"post","link":"https:\/\/theapnachhattisgarh.com\/?p=2527","title":{"rendered":"Adani Power Revives Decade-Old Stalled Project, Commissions First 660 MW Unit at Korba in Chhattisgarh"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div>\n<h3 class=\"wp-block-heading\">Two Years of Dedicated Efforts, Over 250 Engineers and Thousands of Workers Bring a Long-Pending Power Project Back to Life<\/h3>\n<p class=\"wp-block-paragraph\"><strong>KORBA, CHHATTISGARH :<\/strong> In a major development for the power sector in Chhattisgarh, <strong>Adani Power Limited has successfully commissioned the first 660 MW unit of the 1,320 MW expansion project at its Korba Power Station<\/strong>, located in Pathadi village of Korba district. The achievement marks the revival of a major power project that had remained incomplete for nearly a decade, bringing renewed momentum to the state\u2019s electricity generation infrastructure.<\/p>\n<p class=\"wp-block-paragraph\">The successful commissioning is the result of nearly <strong>two years of continuous engineering efforts, detailed technical assessments and coordinated execution<\/strong>. More than <strong>250 engineers<\/strong>, along with several Indian equipment manufacturers, technical partners and thousands of workers, played a significant role in bringing the long-stalled project back to life.<\/p>\n<p class=\"wp-block-paragraph\">At the peak of construction activities, approximately <strong>10,000 people were engaged<\/strong> at the project site, reflecting the scale of the restoration and construction work.<\/p>\n<h2 class=\"wp-block-heading\">A Decade-Old Project Gets a New Lease of Life<\/h2>\n<p class=\"wp-block-paragraph\">The revival journey began in <strong>August 2024<\/strong>, when Adani Power acquired <strong>Lanco Amarkantak Power Limited for \u20b94,101 crore through the National Company Law Tribunal (NCLT) resolution process<\/strong>.<\/p>\n<p class=\"wp-block-paragraph\">At the time of acquisition, the company had an operational power generation capacity of <strong>600 MW<\/strong>, while its ambitious <strong>1,320 MW expansion project<\/strong> was still under construction.<\/p>\n<p class=\"wp-block-paragraph\">Approximately <strong>70 per cent of the expansion project had already been completed<\/strong>, but construction activities had remained suspended since 2016. The prolonged shutdown created significant technical and operational challenges, requiring the new management to undertake a comprehensive assessment of the existing infrastructure.<\/p>\n<p class=\"wp-block-paragraph\">The biggest challenge was not simply completing the remaining construction work but understanding and restoring a project that had remained inactive for several years.<\/p>\n<h2 class=\"wp-block-heading\">Major Engineering Challenges Overcome Through Teamwork<\/h2>\n<p class=\"wp-block-paragraph\">The project presented several complex engineering challenges. Due to the long period of inactivity, the condition of machinery, equipment, plant structures and supporting infrastructure required detailed inspection.<\/p>\n<p class=\"wp-block-paragraph\">Furthermore, several important technical documents, engineering drawings and original project records were either unavailable or incomplete. The original engineering and construction contractors were also no longer associated with the project.<\/p>\n<p class=\"wp-block-paragraph\">To address these challenges, Adani Power deployed a specialised team of engineers and technical professionals to conduct detailed inspections and reassess the entire project.<\/p>\n<p class=\"wp-block-paragraph\">The team examined critical infrastructure, including:<\/p>\n<ul class=\"wp-block-list\">\n<li><strong>Boiler systems<\/strong> and associated equipment.<\/li>\n<li><strong>Turbine-generator systems<\/strong>.<\/li>\n<li>Electrical equipment and power generation infrastructure.<\/li>\n<li>Coal handling and transportation systems.<\/li>\n<li>Water supply and management systems.<\/li>\n<li>Supporting plant infrastructure and operational facilities.<\/li>\n<li>Transmission arrangements required to evacuate generated electricity to the power grid.<\/li>\n<\/ul>\n<p class=\"wp-block-paragraph\">Wherever original engineering records were unavailable, the engineers reconstructed essential technical documentation and prepared designs based on the actual site conditions.<\/p>\n<p class=\"wp-block-paragraph\">The team also worked on strengthening and restoring existing infrastructure wherever necessary, while replacing or upgrading components that could no longer be safely or efficiently reused.<\/p>\n<p class=\"wp-block-paragraph\">Through systematic planning, technical expertise and coordinated execution, the project gradually moved towards operational readiness.<\/p>\n<h2 class=\"wp-block-heading\">First 660 MW Unit Commissioned, Second Unit in Progress<\/h2>\n<p class=\"wp-block-paragraph\">With the successful commissioning of the first <strong>660 MW generating unit<\/strong>, the project has achieved a significant milestone.<\/p>\n<p class=\"wp-block-paragraph\">The company is now working towards commissioning the <strong>second 660 MW unit<\/strong> over the coming months.<\/p>\n<p class=\"wp-block-paragraph\">Once both units become operational, the expansion project will contribute a total of <strong>1,320 MW<\/strong> of additional generation capacity.<\/p>\n<p class=\"wp-block-paragraph\">Consequently, the total installed power generation capacity of the Korba Power Station will increase from its existing 600 MW to <strong>1,920 MW<\/strong>.<\/p>\n<p class=\"wp-block-paragraph\">This expansion is expected to strengthen the power generation infrastructure and contribute to meeting the growing electricity demand.<\/p>\n<h2 class=\"wp-block-heading\">Adani Foundation Expands Development Activities in Nearby Villages<\/h2>\n<p class=\"wp-block-paragraph\">Alongside the revival of the power project, <strong>Adani Foundation has undertaken several community development initiatives<\/strong> in villages surrounding the plant, focusing on education, healthcare, infrastructure and public welfare.<\/p>\n<p class=\"wp-block-paragraph\">The initiatives aim to improve access to essential services and create sustainable development opportunities for local communities.<\/p>\n<h3 class=\"wp-block-heading\">Education: Support to 50 Government Schools<\/h3>\n<p class=\"wp-block-paragraph\">Under its education initiatives, the foundation has distributed <strong>4,200 school kits across 50 government schools in 24 villages<\/strong>.<\/p>\n<p class=\"wp-block-paragraph\">Other major initiatives include:<\/p>\n<ul class=\"wp-block-list\">\n<li>Distribution of <strong>220 dual desks across nine schools<\/strong>.<\/li>\n<li>Installation of <strong>RO water filtration systems in 15 schools<\/strong>, benefiting more than 1,800 students and school staff.<\/li>\n<li>Construction of toilets in three schools, providing improved sanitation facilities to more than 800 students.<\/li>\n<li>Development of a <strong>Science and Convention Centre in Korba<\/strong> to encourage educational, scientific and knowledge-based activities.<\/li>\n<\/ul>\n<p class=\"wp-block-paragraph\">In addition, essential facilities have been improved at <strong>18 Anganwadi centres across 11 villages<\/strong>, helping strengthen early childhood care and community services.<\/p>\n<h3 class=\"wp-block-heading\">Project Udaan: Connecting Students with Power Generation Technology<\/h3>\n<p class=\"wp-block-paragraph\">Through <strong>Project Udaan<\/strong>, students from nearby schools are being given an opportunity to visit the Korba Power Plant and understand the functioning of a thermal power generation facility.<\/p>\n<p class=\"wp-block-paragraph\">The initiative provides practical exposure to electricity generation, industrial operations and modern technology.<\/p>\n<p class=\"wp-block-paragraph\">Since October 2025, a total of <strong>164 educational visits have been organised<\/strong>, with the participation of <strong>8,281 students<\/strong>.<\/p>\n<p class=\"wp-block-paragraph\">The programme is designed to connect classroom learning with practical industrial knowledge and encourage students to explore opportunities in science, engineering and technology.<\/p>\n<h2 class=\"wp-block-heading\">Healthcare Services Reach Nearly 17,000 People<\/h2>\n<p class=\"wp-block-paragraph\">Healthcare has also emerged as an important focus area of the foundation\u2019s community development activities.<\/p>\n<p class=\"wp-block-paragraph\">Since <strong>June 2025<\/strong>, mobile healthcare services have been operating in <strong>18 surrounding villages<\/strong>, reaching approximately <strong>17,000 people<\/strong>.<\/p>\n<p class=\"wp-block-paragraph\">The initiatives include:<\/p>\n<ul class=\"wp-block-list\">\n<li>Mobile healthcare services in remote villages.<\/li>\n<li>Organisation of <strong>six multi-speciality health camps<\/strong>.<\/li>\n<li>Eye examinations and other essential healthcare services.<\/li>\n<li>Distribution of <strong>65 assistive devices<\/strong> to people requiring support with mobility and everyday activities.<\/li>\n<\/ul>\n<p class=\"wp-block-paragraph\">These initiatives are aimed at improving healthcare accessibility, particularly for people living in villages where access to specialised medical facilities may be limited.<\/p>\n<h2 class=\"wp-block-heading\">Solar Street Lighting Benefits More Than 25,000 People<\/h2>\n<p class=\"wp-block-paragraph\">To improve rural infrastructure and public safety, Adani Foundation has installed <strong>240 solar street lights across 15 villages under 11 Gram Panchayats<\/strong>.<\/p>\n<p class=\"wp-block-paragraph\">These installations are benefiting more than <strong>25,000 people<\/strong> by improving illumination in residential areas and public spaces.<\/p>\n<p class=\"wp-block-paragraph\">Additionally, <strong>five solar high-mast lights<\/strong> have been installed in village markets and weekly market areas to improve visibility and facilitate safer public movement after sunset.<\/p>\n<p class=\"wp-block-paragraph\">The initiative also supports the use of renewable energy-based solutions for rural infrastructure development.<\/p>\n<h2 class=\"wp-block-heading\">A Significant Milestone for Korba\u2019s Power and Development Landscape<\/h2>\n<p class=\"wp-block-paragraph\">The successful commissioning of the first 660 MW unit represents more than the completion of an unfinished industrial project. It demonstrates how detailed engineering assessments, technological expertise, workforce coordination and sustained efforts can revive infrastructure that had remained stalled for years.<\/p>\n<p class=\"wp-block-paragraph\">The revival of the Korba expansion project is an important development for Chhattisgarh\u2019s power generation sector. With the second unit expected to follow in the coming months, the station is moving towards achieving its expanded <strong>1,920 MW installed capacity<\/strong>.<\/p>\n<p class=\"wp-block-paragraph\">At the same time, initiatives in education, healthcare, sanitation and solar-powered infrastructure are extending the project\u2019s impact beyond the industrial premises and into neighbouring communities.<\/p>\n<p class=\"wp-block-paragraph\"><strong>From restarting long-idle machinery to creating new opportunities for local communities, the Korba project represents a combination of industrial revival, engineering excellence and community development.<\/strong><\/p>\n<p><!--[googlesitekit-end-of-content]--><\/p>\n<p><!-- CONTENT END 1 -->\n    <\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>Two Years of Dedicated Efforts, Over 250 Engineers and Thousands of Workers Bring a Long-Pending Power Project Back<\/p>\n","protected":false},"author":1,"featured_media":2528,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[21],"tags":[],"class_list":["post-2527","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-india"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Two Years of Dedicated Efforts, Over 250 Engineers and Thousands of Workers Bring a Long-Pending Power Project Back to Life KORBA, CHHATTISGARH : In a major development for the power sector in Chhattisgarh, Adani Power Limited has successfully commissioned the first 660 MW unit of the 1,320 MW expansion project at its Korba Power Station,\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"The Apna Chhattisgarh\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/theapnachhattisgarh.com\/?p=2527\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"The Apna Chhattisgarh -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Adani Power Revives Decade-Old Stalled Project, Commissions First 660 MW Unit at Korba in Chhattisgarh - The Apna Chhattisgarh\" \/>\n\t\t<meta property=\"og:description\" content=\"Two Years of Dedicated Efforts, Over 250 Engineers and Thousands of Workers Bring a Long-Pending Power Project Back to Life KORBA, CHHATTISGARH : In a major development for the power sector in Chhattisgarh, Adani Power Limited has successfully commissioned the first 660 MW unit of the 1,320 MW expansion project at its Korba Power Station,\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/theapnachhattisgarh.com\/?p=2527\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/IMG-20261125-WA0008.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/IMG-20261125-WA0008.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t\t<meta property=\"og:image:height\" content=\"751\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-11-25T12:15:16+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-11-25T12:15:16+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Adani Power Revives Decade-Old Stalled Project, Commissions First 660 MW Unit at Korba in Chhattisgarh - The Apna Chhattisgarh\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Two Years of Dedicated Efforts, Over 250 Engineers and Thousands of Workers Bring a Long-Pending Power Project Back to Life KORBA, CHHATTISGARH : In a major development for the power sector in Chhattisgarh, Adani Power Limited has successfully commissioned the first 660 MW unit of the 1,320 MW expansion project at its Korba Power Station,\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/IMG-20261125-WA0008.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2527#blogposting\",\"name\":\"Adani Power Revives Decade-Old Stalled Project, Commissions First 660 MW Unit at Korba in Chhattisgarh - The Apna Chhattisgarh\",\"headline\":\"Adani Power Revives Decade-Old Stalled Project, Commissions First 660 MW Unit at Korba in Chhattisgarh\",\"author\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?author=1#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/IMG-20261125-WA0008.jpg\",\"width\":1600,\"height\":751},\"datePublished\":\"2026-11-25T12:15:16+00:00\",\"dateModified\":\"2026-11-25T12:15:16+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2527#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2527#webpage\"},\"articleSection\":\"India\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2527#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?cat=21#listItem\",\"name\":\"India\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?cat=21#listItem\",\"position\":2,\"name\":\"India\",\"item\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?cat=21\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2527#listItem\",\"name\":\"Adani Power Revives Decade-Old Stalled Project, Commissions First 660 MW Unit at Korba in Chhattisgarh\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2527#listItem\",\"position\":3,\"name\":\"Adani Power Revives Decade-Old Stalled Project, Commissions First 660 MW Unit at Korba in Chhattisgarh\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?cat=21#listItem\",\"name\":\"India\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#organization\",\"name\":\"The Apna Chhattisgarh\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cropped-WhatsApp-Image-2026-10-24-at-10.47.40-PM.jpeg\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2527\\\/#organizationLogo\",\"width\":1597,\"height\":362},\"image\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2527\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?author=1#author\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?author=1\",\"name\":\"The Apna Chhattisgarh\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2527#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af79d0a817c8720a95b0601916cbb419fbcc63fe5df7fc5a696773013f741e58?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"The Apna Chhattisgarh\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2527#webpage\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2527\",\"name\":\"Adani Power Revives Decade-Old Stalled Project, Commissions First 660 MW Unit at Korba in Chhattisgarh - The Apna Chhattisgarh\",\"description\":\"Two Years of Dedicated Efforts, Over 250 Engineers and Thousands of Workers Bring a Long-Pending Power Project Back to Life KORBA, CHHATTISGARH : In a major development for the power sector in Chhattisgarh, Adani Power Limited has successfully commissioned the first 660 MW unit of the 1,320 MW expansion project at its Korba Power Station,\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2527#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?author=1#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?author=1#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/IMG-20261125-WA0008.jpg\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2527\\\/#mainImage\",\"width\":1600,\"height\":751},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2527#mainImage\"},\"datePublished\":\"2026-11-25T12:15:16+00:00\",\"dateModified\":\"2026-11-25T12:15:16+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#website\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/\",\"name\":\"The Apna Chhattisgarh\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Adani Power Revives Decade-Old Stalled Project, Commissions First 660 MW Unit at Korba in Chhattisgarh - The Apna Chhattisgarh","description":"Two Years of Dedicated Efforts, Over 250 Engineers and Thousands of Workers Bring a Long-Pending Power Project Back to Life KORBA, CHHATTISGARH : In a major development for the power sector in Chhattisgarh, Adani Power Limited has successfully commissioned the first 660 MW unit of the 1,320 MW expansion project at its Korba Power Station,","canonical_url":"https:\/\/theapnachhattisgarh.com\/?p=2527","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/theapnachhattisgarh.com\/?p=2527#blogposting","name":"Adani Power Revives Decade-Old Stalled Project, Commissions First 660 MW Unit at Korba in Chhattisgarh - The Apna Chhattisgarh","headline":"Adani Power Revives Decade-Old Stalled Project, Commissions First 660 MW Unit at Korba in Chhattisgarh","author":{"@id":"https:\/\/theapnachhattisgarh.com\/?author=1#author"},"publisher":{"@id":"https:\/\/theapnachhattisgarh.com\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/IMG-20261125-WA0008.jpg","width":1600,"height":751},"datePublished":"2026-11-25T12:15:16+00:00","dateModified":"2026-11-25T12:15:16+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/theapnachhattisgarh.com\/?p=2527#webpage"},"isPartOf":{"@id":"https:\/\/theapnachhattisgarh.com\/?p=2527#webpage"},"articleSection":"India"},{"@type":"BreadcrumbList","@id":"https:\/\/theapnachhattisgarh.com\/?p=2527#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/#listItem","position":1,"name":"Home","item":"https:\/\/theapnachhattisgarh.com\/","nextItem":{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/?cat=21#listItem","name":"India"}},{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/?cat=21#listItem","position":2,"name":"India","item":"https:\/\/theapnachhattisgarh.com\/?cat=21","nextItem":{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/?p=2527#listItem","name":"Adani Power Revives Decade-Old Stalled Project, Commissions First 660 MW Unit at Korba in Chhattisgarh"},"previousItem":{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/?p=2527#listItem","position":3,"name":"Adani Power Revives Decade-Old Stalled Project, Commissions First 660 MW Unit at Korba in Chhattisgarh","previousItem":{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/?cat=21#listItem","name":"India"}}]},{"@type":"Organization","@id":"https:\/\/theapnachhattisgarh.com\/#organization","name":"The Apna Chhattisgarh","url":"https:\/\/theapnachhattisgarh.com\/","logo":{"@type":"ImageObject","url":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/10\/cropped-WhatsApp-Image-2026-10-24-at-10.47.40-PM.jpeg","@id":"https:\/\/theapnachhattisgarh.com\/?p=2527\/#organizationLogo","width":1597,"height":362},"image":{"@id":"https:\/\/theapnachhattisgarh.com\/?p=2527\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/theapnachhattisgarh.com\/?author=1#author","url":"https:\/\/theapnachhattisgarh.com\/?author=1","name":"The Apna Chhattisgarh","image":{"@type":"ImageObject","@id":"https:\/\/theapnachhattisgarh.com\/?p=2527#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/af79d0a817c8720a95b0601916cbb419fbcc63fe5df7fc5a696773013f741e58?s=96&d=mm&r=g","width":96,"height":96,"caption":"The Apna Chhattisgarh"}},{"@type":"WebPage","@id":"https:\/\/theapnachhattisgarh.com\/?p=2527#webpage","url":"https:\/\/theapnachhattisgarh.com\/?p=2527","name":"Adani Power Revives Decade-Old Stalled Project, Commissions First 660 MW Unit at Korba in Chhattisgarh - The Apna Chhattisgarh","description":"Two Years of Dedicated Efforts, Over 250 Engineers and Thousands of Workers Bring a Long-Pending Power Project Back to Life KORBA, CHHATTISGARH : In a major development for the power sector in Chhattisgarh, Adani Power Limited has successfully commissioned the first 660 MW unit of the 1,320 MW expansion project at its Korba Power Station,","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/theapnachhattisgarh.com\/#website"},"breadcrumb":{"@id":"https:\/\/theapnachhattisgarh.com\/?p=2527#breadcrumblist"},"author":{"@id":"https:\/\/theapnachhattisgarh.com\/?author=1#author"},"creator":{"@id":"https:\/\/theapnachhattisgarh.com\/?author=1#author"},"image":{"@type":"ImageObject","url":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/IMG-20261125-WA0008.jpg","@id":"https:\/\/theapnachhattisgarh.com\/?p=2527\/#mainImage","width":1600,"height":751},"primaryImageOfPage":{"@id":"https:\/\/theapnachhattisgarh.com\/?p=2527#mainImage"},"datePublished":"2026-11-25T12:15:16+00:00","dateModified":"2026-11-25T12:15:16+00:00"},{"@type":"WebSite","@id":"https:\/\/theapnachhattisgarh.com\/#website","url":"https:\/\/theapnachhattisgarh.com\/","name":"The Apna Chhattisgarh","inLanguage":"en-US","publisher":{"@id":"https:\/\/theapnachhattisgarh.com\/#organization"}}]},"og:locale":"en_US","og:site_name":"The Apna Chhattisgarh -","og:type":"article","og:title":"Adani Power Revives Decade-Old Stalled Project, Commissions First 660 MW Unit at Korba in Chhattisgarh - The Apna Chhattisgarh","og:description":"Two Years of Dedicated Efforts, Over 250 Engineers and Thousands of Workers Bring a Long-Pending Power Project Back to Life KORBA, CHHATTISGARH : In a major development for the power sector in Chhattisgarh, Adani Power Limited has successfully commissioned the first 660 MW unit of the 1,320 MW expansion project at its Korba Power Station,","og:url":"https:\/\/theapnachhattisgarh.com\/?p=2527","og:image":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/IMG-20261125-WA0008.jpg","og:image:secure_url":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/IMG-20261125-WA0008.jpg","og:image:width":1600,"og:image:height":751,"article:published_time":"2026-11-25T12:15:16+00:00","article:modified_time":"2026-11-25T12:15:16+00:00","twitter:card":"summary_large_image","twitter:title":"Adani Power Revives Decade-Old Stalled Project, Commissions First 660 MW Unit at Korba in Chhattisgarh - The Apna Chhattisgarh","twitter:description":"Two Years of Dedicated Efforts, Over 250 Engineers and Thousands of Workers Bring a Long-Pending Power Project Back to Life KORBA, CHHATTISGARH : In a major development for the power sector in Chhattisgarh, Adani Power Limited has successfully commissioned the first 660 MW unit of the 1,320 MW expansion project at its Korba Power Station,","twitter:image":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/IMG-20261125-WA0008.jpg"},"aioseo_meta_data":{"post_id":"2527","title":null,"description":null,"keywords":null,"keyphrases":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":true,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-11-25 12:18:22","updated":"2026-11-25 12:18:22"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/theapnachhattisgarh.com\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/theapnachhattisgarh.com\/?cat=21\" title=\"India\">India<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tAdani Power Revives Decade-Old Stalled Project, Commissions First 660 MW Unit at Korba in Chhattisgarh\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/theapnachhattisgarh.com\/"},{"label":"India","link":"https:\/\/theapnachhattisgarh.com\/?cat=21"},{"label":"Adani Power Revives Decade-Old Stalled Project, Commissions First 660 MW Unit at Korba in Chhattisgarh","link":"https:\/\/theapnachhattisgarh.com\/?p=2527"}],"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/IMG-20261125-WA0008.jpg","_links":{"self":[{"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=\/wp\/v2\/posts\/2527","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2527"}],"version-history":[{"count":0,"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=\/wp\/v2\/posts\/2527\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=\/wp\/v2\/media\/2528"}],"wp:attachment":[{"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2527"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2527"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2527"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}