{"id":2138,"date":"2026-11-23T15:50:14","date_gmt":"2026-11-23T15:50:14","guid":{"rendered":"https:\/\/theapnachhattisgarh.com\/?p=2138"},"modified":"2026-11-23T15:50:14","modified_gmt":"2026-11-23T15:50:14","slug":"bullet-train-trials-on-50-km-gujarat-stretch-likely-to-begin-by-may-2027-india-news","status":"publish","type":"post","link":"https:\/\/theapnachhattisgarh.com\/?p=2138","title":{"rendered":"Bullet train trials on 50-km Gujarat stretch likely to begin by May 2027 | India News"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div id=\"parent_top_div\" style=\"margin:0 0\">\n<p>India\u2019s first bullet train may start its trial runs by May 2027 on a small part of the 508-kilometre-long Mumbai-Ahmedabad stretch, a top government official said on Monday.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>This comes as a nearly 50-km section between Billimora and Surat in Gujarat has been fully electrified, and the tracks will be ready for trial runs by January after the signalling work is completed.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>\u201cThe train will be available for trial runs by April or May,\u201d he said.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>The trainsets are being developed by state-owned manufacturer BEML at its facility in Bengaluru. The B28 train will be capable of running at speeds of up to 280 km per hour.<\/p>\n<p><span style=\"display:block;height:1px\">\u00a0<\/span><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>The tracks are currently being equipped with the Level-2 European Train Control System (ETCS) by a joint venture between German manufacturer Siemens AG and Indian developer DRA Infracon, which secured the contract for around Rs 4,100 crore.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>The government has a target of flagging off the high-speed rail corridor by August 2027.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>The project has been mired in controversy over delays and cost escalation, which Vaishnaw has previously attributed to political issues, particularly regarding land acquisition in Maharashtra.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>The project\u2019s cost has risen to nearly Rs 2 trillion, almost double the initial cost estimate of Rs 1.08 trillion, while the initial deadline of 2022 was missed nearly five years ago.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>Concerns over India-Japan coordination had also begun surfacing after a former minister in the Japanese government blamed India for the delays.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>Freight Reforms Bearing Fruit<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>According to ministry officials, freight reforms introduced by the national transporter, including containerisation of commodities and rationalisation of freight rates, have led to an increase in volumes of between 10 and 70 per cent from April to October.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>\u201cThis addition has resulted in an incremental revenue of Rs 1078 crore in commodity classes where reforms were undertaken,\u201d said the official.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>Railways, which has historically been overly dependent on coal and iron ore traffic (60 per cent of freight volumes), is trying to capture the transportation market in other commodities. So far, it has simplified regulations and moved away from slab-based rate systems in key commodities like salt, foodgrains, fertilisers, cement and containers.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>\u201cBetween sub-classes of major commodities, around 120 classes have been the subject of reforms, while another 100 will be covered soon,\u201d a second official said.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>The official also added that passenger volumes would recover to pre-Covid levels for the first time since the pandemic in 2026-27. A total of 2,500 additional train services have been introduced since the Covid-19 pandemic, and passenger volumes are likely to cross 8 billion this financial year.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>Of the 70 divisions, 38 have now begun reporting punctuality of over 95 per cent, the official added.<\/p>\n<p><small class=\"brtagPara\">\u00a0<\/small><\/p>\n<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>India\u2019s first bullet train may start its trial runs by May 2027 on a small part of the<\/p>\n","protected":false},"author":1,"featured_media":2139,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[21],"tags":[],"class_list":["post-2138","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-india"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"India\u2019s first bullet train may start its trial runs by May 2027 on a small part of the 508-kilometre-long Mumbai-Ahmedabad stretch, a top government official said on Monday. This comes as a nearly 50-km section between Billimora and Surat in Gujarat has been fully electrified, and the tracks will be ready for trial runs\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"The Apna Chhattisgarh\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/theapnachhattisgarh.com\/?p=2138\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"The Apna Chhattisgarh -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Bullet train trials on 50-km Gujarat stretch likely to begin by May 2027 | India News - The Apna Chhattisgarh\" \/>\n\t\t<meta property=\"og:description\" content=\"India\u2019s first bullet train may start its trial runs by May 2027 on a small part of the 508-kilometre-long Mumbai-Ahmedabad stretch, a top government official said on Monday. This comes as a nearly 50-km section between Billimora and Surat in Gujarat has been fully electrified, and the tracks will be ready for trial runs\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/theapnachhattisgarh.com\/?p=2138\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/1682862065-7097.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/1682862065-7097.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-11-23T15:50:14+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-11-23T15:50:14+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Bullet train trials on 50-km Gujarat stretch likely to begin by May 2027 | India News - The Apna Chhattisgarh\" \/>\n\t\t<meta name=\"twitter:description\" content=\"India\u2019s first bullet train may start its trial runs by May 2027 on a small part of the 508-kilometre-long Mumbai-Ahmedabad stretch, a top government official said on Monday. This comes as a nearly 50-km section between Billimora and Surat in Gujarat has been fully electrified, and the tracks will be ready for trial runs\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/1682862065-7097.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2138#blogposting\",\"name\":\"Bullet train trials on 50-km Gujarat stretch likely to begin by May 2027 | India News - The Apna Chhattisgarh\",\"headline\":\"Bullet train trials on 50-km Gujarat stretch likely to begin by May 2027 | India News\",\"author\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?author=1#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/1682862065-7097.jpg\",\"width\":1200,\"height\":628},\"datePublished\":\"2026-11-23T15:50:14+00:00\",\"dateModified\":\"2026-11-23T15:50:14+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2138#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2138#webpage\"},\"articleSection\":\"India\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2138#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?cat=21#listItem\",\"name\":\"India\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?cat=21#listItem\",\"position\":2,\"name\":\"India\",\"item\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?cat=21\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2138#listItem\",\"name\":\"Bullet train trials on 50-km Gujarat stretch likely to begin by May 2027 | India News\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2138#listItem\",\"position\":3,\"name\":\"Bullet train trials on 50-km Gujarat stretch likely to begin by May 2027 | India News\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?cat=21#listItem\",\"name\":\"India\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#organization\",\"name\":\"The Apna Chhattisgarh\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cropped-WhatsApp-Image-2026-10-24-at-10.47.40-PM.jpeg\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2138\\\/#organizationLogo\",\"width\":1597,\"height\":362},\"image\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2138\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?author=1#author\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?author=1\",\"name\":\"The Apna Chhattisgarh\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2138#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af79d0a817c8720a95b0601916cbb419fbcc63fe5df7fc5a696773013f741e58?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"The Apna Chhattisgarh\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2138#webpage\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2138\",\"name\":\"Bullet train trials on 50-km Gujarat stretch likely to begin by May 2027 | India News - The Apna Chhattisgarh\",\"description\":\"India\\u2019s first bullet train may start its trial runs by May 2027 on a small part of the 508-kilometre-long Mumbai-Ahmedabad stretch, a top government official said on Monday. This comes as a nearly 50-km section between Billimora and Surat in Gujarat has been fully electrified, and the tracks will be ready for trial runs\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2138#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?author=1#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?author=1#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/1682862065-7097.jpg\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2138\\\/#mainImage\",\"width\":1200,\"height\":628},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=2138#mainImage\"},\"datePublished\":\"2026-11-23T15:50:14+00:00\",\"dateModified\":\"2026-11-23T15:50:14+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#website\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/\",\"name\":\"The Apna Chhattisgarh\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Bullet train trials on 50-km Gujarat stretch likely to begin by May 2027 | India News - The Apna Chhattisgarh","description":"India\u2019s first bullet train may start its trial runs by May 2027 on a small part of the 508-kilometre-long Mumbai-Ahmedabad stretch, a top government official said on Monday. This comes as a nearly 50-km section between Billimora and Surat in Gujarat has been fully electrified, and the tracks will be ready for trial runs","canonical_url":"https:\/\/theapnachhattisgarh.com\/?p=2138","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/theapnachhattisgarh.com\/?p=2138#blogposting","name":"Bullet train trials on 50-km Gujarat stretch likely to begin by May 2027 | India News - The Apna Chhattisgarh","headline":"Bullet train trials on 50-km Gujarat stretch likely to begin by May 2027 | India News","author":{"@id":"https:\/\/theapnachhattisgarh.com\/?author=1#author"},"publisher":{"@id":"https:\/\/theapnachhattisgarh.com\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/1682862065-7097.jpg","width":1200,"height":628},"datePublished":"2026-11-23T15:50:14+00:00","dateModified":"2026-11-23T15:50:14+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/theapnachhattisgarh.com\/?p=2138#webpage"},"isPartOf":{"@id":"https:\/\/theapnachhattisgarh.com\/?p=2138#webpage"},"articleSection":"India"},{"@type":"BreadcrumbList","@id":"https:\/\/theapnachhattisgarh.com\/?p=2138#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/#listItem","position":1,"name":"Home","item":"https:\/\/theapnachhattisgarh.com\/","nextItem":{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/?cat=21#listItem","name":"India"}},{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/?cat=21#listItem","position":2,"name":"India","item":"https:\/\/theapnachhattisgarh.com\/?cat=21","nextItem":{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/?p=2138#listItem","name":"Bullet train trials on 50-km Gujarat stretch likely to begin by May 2027 | India News"},"previousItem":{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/?p=2138#listItem","position":3,"name":"Bullet train trials on 50-km Gujarat stretch likely to begin by May 2027 | India News","previousItem":{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/?cat=21#listItem","name":"India"}}]},{"@type":"Organization","@id":"https:\/\/theapnachhattisgarh.com\/#organization","name":"The Apna Chhattisgarh","url":"https:\/\/theapnachhattisgarh.com\/","logo":{"@type":"ImageObject","url":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/10\/cropped-WhatsApp-Image-2026-10-24-at-10.47.40-PM.jpeg","@id":"https:\/\/theapnachhattisgarh.com\/?p=2138\/#organizationLogo","width":1597,"height":362},"image":{"@id":"https:\/\/theapnachhattisgarh.com\/?p=2138\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/theapnachhattisgarh.com\/?author=1#author","url":"https:\/\/theapnachhattisgarh.com\/?author=1","name":"The Apna Chhattisgarh","image":{"@type":"ImageObject","@id":"https:\/\/theapnachhattisgarh.com\/?p=2138#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/af79d0a817c8720a95b0601916cbb419fbcc63fe5df7fc5a696773013f741e58?s=96&d=mm&r=g","width":96,"height":96,"caption":"The Apna Chhattisgarh"}},{"@type":"WebPage","@id":"https:\/\/theapnachhattisgarh.com\/?p=2138#webpage","url":"https:\/\/theapnachhattisgarh.com\/?p=2138","name":"Bullet train trials on 50-km Gujarat stretch likely to begin by May 2027 | India News - The Apna Chhattisgarh","description":"India\u2019s first bullet train may start its trial runs by May 2027 on a small part of the 508-kilometre-long Mumbai-Ahmedabad stretch, a top government official said on Monday. This comes as a nearly 50-km section between Billimora and Surat in Gujarat has been fully electrified, and the tracks will be ready for trial runs","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/theapnachhattisgarh.com\/#website"},"breadcrumb":{"@id":"https:\/\/theapnachhattisgarh.com\/?p=2138#breadcrumblist"},"author":{"@id":"https:\/\/theapnachhattisgarh.com\/?author=1#author"},"creator":{"@id":"https:\/\/theapnachhattisgarh.com\/?author=1#author"},"image":{"@type":"ImageObject","url":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/1682862065-7097.jpg","@id":"https:\/\/theapnachhattisgarh.com\/?p=2138\/#mainImage","width":1200,"height":628},"primaryImageOfPage":{"@id":"https:\/\/theapnachhattisgarh.com\/?p=2138#mainImage"},"datePublished":"2026-11-23T15:50:14+00:00","dateModified":"2026-11-23T15:50:14+00:00"},{"@type":"WebSite","@id":"https:\/\/theapnachhattisgarh.com\/#website","url":"https:\/\/theapnachhattisgarh.com\/","name":"The Apna Chhattisgarh","inLanguage":"en-US","publisher":{"@id":"https:\/\/theapnachhattisgarh.com\/#organization"}}]},"og:locale":"en_US","og:site_name":"The Apna Chhattisgarh -","og:type":"article","og:title":"Bullet train trials on 50-km Gujarat stretch likely to begin by May 2027 | India News - The Apna Chhattisgarh","og:description":"India\u2019s first bullet train may start its trial runs by May 2027 on a small part of the 508-kilometre-long Mumbai-Ahmedabad stretch, a top government official said on Monday. This comes as a nearly 50-km section between Billimora and Surat in Gujarat has been fully electrified, and the tracks will be ready for trial runs","og:url":"https:\/\/theapnachhattisgarh.com\/?p=2138","og:image":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/1682862065-7097.jpg","og:image:secure_url":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/1682862065-7097.jpg","og:image:width":1200,"og:image:height":628,"article:published_time":"2026-11-23T15:50:14+00:00","article:modified_time":"2026-11-23T15:50:14+00:00","twitter:card":"summary_large_image","twitter:title":"Bullet train trials on 50-km Gujarat stretch likely to begin by May 2027 | India News - The Apna Chhattisgarh","twitter:description":"India\u2019s first bullet train may start its trial runs by May 2027 on a small part of the 508-kilometre-long Mumbai-Ahmedabad stretch, a top government official said on Monday. This comes as a nearly 50-km section between Billimora and Surat in Gujarat has been fully electrified, and the tracks will be ready for trial runs","twitter:image":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/1682862065-7097.jpg"},"aioseo_meta_data":{"post_id":"2138","title":null,"description":null,"keywords":null,"keyphrases":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":true,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-11-23 15:51:41","updated":"2026-11-23 15:51:41"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/theapnachhattisgarh.com\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/theapnachhattisgarh.com\/?cat=21\" title=\"India\">India<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tBullet train trials on 50-km Gujarat stretch likely to begin by May 2027 | India News\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/theapnachhattisgarh.com\/"},{"label":"India","link":"https:\/\/theapnachhattisgarh.com\/?cat=21"},{"label":"Bullet train trials on 50-km Gujarat stretch likely to begin by May 2027 | India News","link":"https:\/\/theapnachhattisgarh.com\/?p=2138"}],"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/1682862065-7097.jpg","_links":{"self":[{"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=\/wp\/v2\/posts\/2138","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2138"}],"version-history":[{"count":0,"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=\/wp\/v2\/posts\/2138\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=\/wp\/v2\/media\/2139"}],"wp:attachment":[{"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2138"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2138"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2138"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}