{"id":1883,"date":"2026-11-22T12:42:02","date_gmt":"2026-11-22T12:42:02","guid":{"rendered":"https:\/\/theapnachhattisgarh.com\/?p=1883"},"modified":"2026-11-22T12:42:02","modified_gmt":"2026-11-22T12:42:02","slug":"battery-procurement-key-to-project-viability-amid-grid-congestion-icra-industry-news","status":"publish","type":"post","link":"https:\/\/theapnachhattisgarh.com\/?p=1883","title":{"rendered":"Battery procurement key to project viability amid grid congestion: ICRA | Industry News"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div id=\"parent_top_div\" style=\"margin:0 0\">\n<p>India\u2019s rapid renewable capacity addition, which continues to outpace transmission augmentation, particularly in resource-rich states such as Rajasthan and Gujarat, is increasing grid congestion and the need for storage to absorb surplus generation, shift supply to non-solar hours and ease network constraints.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>The country\u2019s battery energy storage system (BESS) market is moving from tendering to execution, backed by strong policy support and a large tender pipeline, ratings agency ICRA said in a report.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>\u201cHowever, the rebound in battery prices, rupee depreciation and aggressive bids make timely battery procurement, robust long-term service agreements and offtake tie-ups critical for project viability,\u201d it said.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>According to the report, strong energy storage demand and a sizeable tender pipeline are supporting growth in the sector, but execution remains a key monitorable.<\/p>\n<p><span style=\"display:block;height:1px\">\u00a0<\/span><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>\u201cOperational BESS capacity is also rising, signalling progress from tendering to deployment. Policy support, including the government\u2019s Viability Gap Funding schemes announced in 2023, 2025 and 2026 covering 135.8 gigawatt-hours, provides a significant source of capital support,\u201d the report said.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>ICRA added that the viability of the recently aggressively bid projects would critically depend on battery procurement costs and currency movements. For developers in the renewable energy sector, costs not covered by the supplier, including performance penalties, additional batteries and post-warranty maintenance, are important risks.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>\u201cAt a battery pack cost of USD 70 per kilowatt-hour, the cumulative debt service coverage ratio of 1.17-1.27 times is expected at tariffs of Rs 2.60-2.80 lakh per megawatt per month. Competitive procurement and protection against cost escalation remain central to the assessment,\u201d the report said.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<p>It added that lower upfront funding and supplier guarantees do not eliminate future costs and operating risks, and project assessment should account for eventual duty payments and check whether supplier guarantees adequately cover commitments to the power buyer.<\/p>\n<p><small class=\"brtag\">\u00a0<\/small><\/p>\n<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>India\u2019s rapid renewable capacity addition, which continues to outpace transmission augmentation, particularly in resource-rich states such as Rajasthan<\/p>\n","protected":false},"author":1,"featured_media":1884,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[21],"tags":[],"class_list":["post-1883","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-india"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"India\u2019s rapid renewable capacity addition, which continues to outpace transmission augmentation, particularly in resource-rich states such as Rajasthan and Gujarat, is increasing grid congestion and the need for storage to absorb surplus generation, shift supply to non-solar hours and ease network constraints. The country\u2019s battery energy storage system (BESS) market is moving from tendering\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"The Apna Chhattisgarh\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/theapnachhattisgarh.com\/?p=1883\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"The Apna Chhattisgarh -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Battery procurement key to project viability amid grid congestion: ICRA | Industry News - The Apna Chhattisgarh\" \/>\n\t\t<meta property=\"og:description\" content=\"India\u2019s rapid renewable capacity addition, which continues to outpace transmission augmentation, particularly in resource-rich states such as Rajasthan and Gujarat, is increasing grid congestion and the need for storage to absorb surplus generation, shift supply to non-solar hours and ease network constraints. The country\u2019s battery energy storage system (BESS) market is moving from tendering\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/theapnachhattisgarh.com\/?p=1883\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/1758905621-3118.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/1758905621-3118.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-11-22T12:42:02+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-11-22T12:42:02+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Battery procurement key to project viability amid grid congestion: ICRA | Industry News - The Apna Chhattisgarh\" \/>\n\t\t<meta name=\"twitter:description\" content=\"India\u2019s rapid renewable capacity addition, which continues to outpace transmission augmentation, particularly in resource-rich states such as Rajasthan and Gujarat, is increasing grid congestion and the need for storage to absorb surplus generation, shift supply to non-solar hours and ease network constraints. The country\u2019s battery energy storage system (BESS) market is moving from tendering\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/1758905621-3118.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=1883#blogposting\",\"name\":\"Battery procurement key to project viability amid grid congestion: ICRA | Industry News - The Apna Chhattisgarh\",\"headline\":\"Battery procurement key to project viability amid grid congestion: ICRA | Industry News\",\"author\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?author=1#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/1758905621-3118.jpg\",\"width\":1200,\"height\":628},\"datePublished\":\"2026-11-22T12:42:02+00:00\",\"dateModified\":\"2026-11-22T12:42:02+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=1883#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=1883#webpage\"},\"articleSection\":\"India\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=1883#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?cat=21#listItem\",\"name\":\"India\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?cat=21#listItem\",\"position\":2,\"name\":\"India\",\"item\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?cat=21\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=1883#listItem\",\"name\":\"Battery procurement key to project viability amid grid congestion: ICRA | Industry News\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=1883#listItem\",\"position\":3,\"name\":\"Battery procurement key to project viability amid grid congestion: ICRA | Industry News\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?cat=21#listItem\",\"name\":\"India\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#organization\",\"name\":\"The Apna Chhattisgarh\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cropped-WhatsApp-Image-2026-10-24-at-10.47.40-PM.jpeg\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=1883\\\/#organizationLogo\",\"width\":1597,\"height\":362},\"image\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=1883\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?author=1#author\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?author=1\",\"name\":\"The Apna Chhattisgarh\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=1883#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af79d0a817c8720a95b0601916cbb419fbcc63fe5df7fc5a696773013f741e58?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"The Apna Chhattisgarh\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=1883#webpage\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=1883\",\"name\":\"Battery procurement key to project viability amid grid congestion: ICRA | Industry News - The Apna Chhattisgarh\",\"description\":\"India\\u2019s rapid renewable capacity addition, which continues to outpace transmission augmentation, particularly in resource-rich states such as Rajasthan and Gujarat, is increasing grid congestion and the need for storage to absorb surplus generation, shift supply to non-solar hours and ease network constraints. The country\\u2019s battery energy storage system (BESS) market is moving from tendering\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=1883#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?author=1#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?author=1#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/1758905621-3118.jpg\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=1883\\\/#mainImage\",\"width\":1200,\"height\":628},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/?p=1883#mainImage\"},\"datePublished\":\"2026-11-22T12:42:02+00:00\",\"dateModified\":\"2026-11-22T12:42:02+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#website\",\"url\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/\",\"name\":\"The Apna Chhattisgarh\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/theapnachhattisgarh.com\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Battery procurement key to project viability amid grid congestion: ICRA | Industry News - The Apna Chhattisgarh","description":"India\u2019s rapid renewable capacity addition, which continues to outpace transmission augmentation, particularly in resource-rich states such as Rajasthan and Gujarat, is increasing grid congestion and the need for storage to absorb surplus generation, shift supply to non-solar hours and ease network constraints. The country\u2019s battery energy storage system (BESS) market is moving from tendering","canonical_url":"https:\/\/theapnachhattisgarh.com\/?p=1883","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/theapnachhattisgarh.com\/?p=1883#blogposting","name":"Battery procurement key to project viability amid grid congestion: ICRA | Industry News - The Apna Chhattisgarh","headline":"Battery procurement key to project viability amid grid congestion: ICRA | Industry News","author":{"@id":"https:\/\/theapnachhattisgarh.com\/?author=1#author"},"publisher":{"@id":"https:\/\/theapnachhattisgarh.com\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/1758905621-3118.jpg","width":1200,"height":628},"datePublished":"2026-11-22T12:42:02+00:00","dateModified":"2026-11-22T12:42:02+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/theapnachhattisgarh.com\/?p=1883#webpage"},"isPartOf":{"@id":"https:\/\/theapnachhattisgarh.com\/?p=1883#webpage"},"articleSection":"India"},{"@type":"BreadcrumbList","@id":"https:\/\/theapnachhattisgarh.com\/?p=1883#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/#listItem","position":1,"name":"Home","item":"https:\/\/theapnachhattisgarh.com\/","nextItem":{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/?cat=21#listItem","name":"India"}},{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/?cat=21#listItem","position":2,"name":"India","item":"https:\/\/theapnachhattisgarh.com\/?cat=21","nextItem":{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/?p=1883#listItem","name":"Battery procurement key to project viability amid grid congestion: ICRA | Industry News"},"previousItem":{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/?p=1883#listItem","position":3,"name":"Battery procurement key to project viability amid grid congestion: ICRA | Industry News","previousItem":{"@type":"ListItem","@id":"https:\/\/theapnachhattisgarh.com\/?cat=21#listItem","name":"India"}}]},{"@type":"Organization","@id":"https:\/\/theapnachhattisgarh.com\/#organization","name":"The Apna Chhattisgarh","url":"https:\/\/theapnachhattisgarh.com\/","logo":{"@type":"ImageObject","url":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/10\/cropped-WhatsApp-Image-2026-10-24-at-10.47.40-PM.jpeg","@id":"https:\/\/theapnachhattisgarh.com\/?p=1883\/#organizationLogo","width":1597,"height":362},"image":{"@id":"https:\/\/theapnachhattisgarh.com\/?p=1883\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/theapnachhattisgarh.com\/?author=1#author","url":"https:\/\/theapnachhattisgarh.com\/?author=1","name":"The Apna Chhattisgarh","image":{"@type":"ImageObject","@id":"https:\/\/theapnachhattisgarh.com\/?p=1883#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/af79d0a817c8720a95b0601916cbb419fbcc63fe5df7fc5a696773013f741e58?s=96&d=mm&r=g","width":96,"height":96,"caption":"The Apna Chhattisgarh"}},{"@type":"WebPage","@id":"https:\/\/theapnachhattisgarh.com\/?p=1883#webpage","url":"https:\/\/theapnachhattisgarh.com\/?p=1883","name":"Battery procurement key to project viability amid grid congestion: ICRA | Industry News - The Apna Chhattisgarh","description":"India\u2019s rapid renewable capacity addition, which continues to outpace transmission augmentation, particularly in resource-rich states such as Rajasthan and Gujarat, is increasing grid congestion and the need for storage to absorb surplus generation, shift supply to non-solar hours and ease network constraints. The country\u2019s battery energy storage system (BESS) market is moving from tendering","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/theapnachhattisgarh.com\/#website"},"breadcrumb":{"@id":"https:\/\/theapnachhattisgarh.com\/?p=1883#breadcrumblist"},"author":{"@id":"https:\/\/theapnachhattisgarh.com\/?author=1#author"},"creator":{"@id":"https:\/\/theapnachhattisgarh.com\/?author=1#author"},"image":{"@type":"ImageObject","url":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/1758905621-3118.jpg","@id":"https:\/\/theapnachhattisgarh.com\/?p=1883\/#mainImage","width":1200,"height":628},"primaryImageOfPage":{"@id":"https:\/\/theapnachhattisgarh.com\/?p=1883#mainImage"},"datePublished":"2026-11-22T12:42:02+00:00","dateModified":"2026-11-22T12:42:02+00:00"},{"@type":"WebSite","@id":"https:\/\/theapnachhattisgarh.com\/#website","url":"https:\/\/theapnachhattisgarh.com\/","name":"The Apna Chhattisgarh","inLanguage":"en-US","publisher":{"@id":"https:\/\/theapnachhattisgarh.com\/#organization"}}]},"og:locale":"en_US","og:site_name":"The Apna Chhattisgarh -","og:type":"article","og:title":"Battery procurement key to project viability amid grid congestion: ICRA | Industry News - The Apna Chhattisgarh","og:description":"India\u2019s rapid renewable capacity addition, which continues to outpace transmission augmentation, particularly in resource-rich states such as Rajasthan and Gujarat, is increasing grid congestion and the need for storage to absorb surplus generation, shift supply to non-solar hours and ease network constraints. The country\u2019s battery energy storage system (BESS) market is moving from tendering","og:url":"https:\/\/theapnachhattisgarh.com\/?p=1883","og:image":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/1758905621-3118.jpg","og:image:secure_url":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/1758905621-3118.jpg","og:image:width":1200,"og:image:height":628,"article:published_time":"2026-11-22T12:42:02+00:00","article:modified_time":"2026-11-22T12:42:02+00:00","twitter:card":"summary_large_image","twitter:title":"Battery procurement key to project viability amid grid congestion: ICRA | Industry News - The Apna Chhattisgarh","twitter:description":"India\u2019s rapid renewable capacity addition, which continues to outpace transmission augmentation, particularly in resource-rich states such as Rajasthan and Gujarat, is increasing grid congestion and the need for storage to absorb surplus generation, shift supply to non-solar hours and ease network constraints. The country\u2019s battery energy storage system (BESS) market is moving from tendering","twitter:image":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/1758905621-3118.jpg"},"aioseo_meta_data":[],"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/theapnachhattisgarh.com\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/theapnachhattisgarh.com\/?cat=21\" title=\"India\">India<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tBattery procurement key to project viability amid grid congestion: ICRA | Industry News\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/theapnachhattisgarh.com\/"},{"label":"India","link":"https:\/\/theapnachhattisgarh.com\/?cat=21"},{"label":"Battery procurement key to project viability amid grid congestion: ICRA | Industry News","link":"https:\/\/theapnachhattisgarh.com\/?p=1883"}],"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/theapnachhattisgarh.com\/wp-content\/uploads\/2026\/11\/1758905621-3118.jpg","_links":{"self":[{"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=\/wp\/v2\/posts\/1883","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1883"}],"version-history":[{"count":0,"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=\/wp\/v2\/posts\/1883\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=\/wp\/v2\/media\/1884"}],"wp:attachment":[{"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1883"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1883"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/theapnachhattisgarh.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1883"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}